Pacific Caisson & Shoring, Inc. Bernards Bros. Inc. (2011), Cal.App.4th
[No.
B219199. Second Dist., Div. Three. Mar. 3, 2011.]
PACIFIC
CAISSON & SHORING, INC., Plaintiff, Cross-defendant and Appellant, v. BERNARDS BROS. INC., Defendant,
Cross-complainant and Respondent.
(Superior
Court of Los Angeles County, No. BC343834, John T. Shook, Judge.)
(Opinion
by Aldrich, J., with Croskey, Acting P. J., and Kitching, J., concurring.)
COUNSEL
Law
Offices of Arthur Jarvis Cohen and Arthur Jarvis Cohen for Plaintiff, Cross-defendant and Appellant.
Law
Offices of Ted R. Gropman and Ted R. Gropman; Benedon & Serlin, Douglas G. Benedon and Gerald M. Serlin for
Defendant, Cross-complainant and Respondent. {Slip Opn. Page 2}
OPINION
ALDRICH,
J.-
INTRODUCTION
Subcontrator
Pacific Caisson & Shoring, Inc. (Pacific) sued its general contractor Bernards Bros. Inc. (Bernards) seeking
payment for work performed under Pacific's subcontract. The trial court granted Bernards' motion for judgment,
ruling, because Pacific did not maintain a Class C-12 specialty license, that it was not "a duly licensed
contractor" and was hence not entitled to bring its action. (Bus. & Prof. Code, § 7031, subd. (a).)
fn. 1 Pacific appeals.
We
hold that Pacific was duly licensed because it held a Class A general engineering contractor's license when it
commenced performance of the subcontract. However, Pacific's Class A license lapsed for two and a half months
during performance. Where the trial court ruled Pacific was never duly licensed, the court never reached the
question whether Pacific nonetheless was entitled to recover because it substantially complied with the
Contractor's State Licensing Law (the CSLL) (§§ 7000 et seq., 7031, subd. (e)). Accordingly, we reverse the
judgment and remand for further proceedings.
FACTUAL
AND PROCEDURAL BACKGROUND
The
evidence is not in dispute. Bernards and Pacific executed a subcontract (the subcontract) in 2002 for Pacific to
provide temporary excavation and support work on a project to construct a medical center for the County of
Ventura. Under the subcontract documents, Pacific agreed to excavate the site for footings, grade beams,
plumbing and utility lines, and other requirements, backfill and grade, and provide temporary support. Pacific
also agreed to prepare and submit "calculations [of] subsurface conditions and geotechnical design parameters,
factors of safety, assumptions, design criteria, overstress values and serviceability/deflection tolerances."
The subcontract price was $360,000. The prime contract required the bidder for the temporary excavation and
support subcontract to maintain a Class C-12 specialty {Slip Opn. Page 3} earthwork and paving contractor's
license (Cal. Code Regs., tit. 16, § 832.12).
fn. 2 Pacific held a
Class A general engineering contractor's license (§ 7056) and a Class B general building contractor's license (§
7057) but never obtained a Class C-12 specialty license. (§ 7058.)
Pacific
commenced work under the subcontract at some point before July 29, 2002 and billed for work performed through
October 28, 2003. Meanwhile, the Contractor's State License Board (the Board) suspended Pacific's licenses on
April 1, 2003 for nonpayment of a judgment. During the period the licenses were under suspension, they also
expired. The licenses were reinstated on June 25, 2003.
Eventually,
Pacific filed this lawsuit seeking $544,567 owed it by Bernards under the subcontract. In its answer to the
complaint, Bernards asserted as an affirmative defense that Pacific was not at all times relevant to this action
properly licensed to perform the work that is the subject of the subcontract. Bernards also cross-complained
alleging Pacific breached its subcontract and seeking reimbursement for monies owed.
Following
the presentation of Pacific's case, Bernards moved for judgment (Code Civ. Proc., § 631.8)
fn. 3 on the ground
that Pacific was precluded by section 7031, subdivision (a) from recovering on its complaint. Bernards based this
argument primarily on the fact that Pacific lacked a Class C-12 specialty earthwork and paving contractor's {Slip
Opn. Page 4} license. Secondarily, Bernards argued that the license Pacific held was suspended during the period
that Pacific was performing its subcontract work and so it was not duly licensed at all times during the
performance of the subcontract. (Ibid.) Pacific countered that its Class A and B licenses were sufficient
and that it substantially complied with the CSLL. The trial court "reluctantly" ruled in favor of Bernards and
dismissed the lawsuit for "lack of a C-12 license." The court did not address any other arguments or decide any
other issues involving Pacific's complaint.
Pacific
moved the trial court for reconsideration arguing that the Class C-12 specialty license is subsumed in the Class
A license. In its opposition, Bernards argued that Pacific's subcontract specified that Pacific must have a
Class C-12 license not a Class A license; and in any event, during the time Pacific was performing work under
its subcontract, Pacific's Class A license was suspended for nearly three months for failure to satisfy a
judgment against it. The trial court granted the motion for reconsideration, reconsidered its prior ruling, and
reconfirmed it. The court entered judgment against Pacific pursuant to section 7031, subdivision (a) and awarded
Bernards damages in the amount of $206,437.91 on its cross-complaint representing disgorgement of money it paid
to an unlicensed contactor. Pacific filed its timely notice of appeal.
DISCUSSION
1.
Overview of the CSLL
The
CSLL (§ 7000 et seq.), a comprehensive legislative scheme governing the construction business in California, is
" 'designed to protect the public from incompetent or dishonest providers of building and construction services.
[Citation.]' [Citation.]" (Alatriste v. Cesar's Exterior Designs, Inc. (2010)
183 Cal.App.4th 656,
664 (Alatriste).) The purpose of section 7031 is to enforce the CSLL. (Asdourian v. Araj
(1985)
38 Cal.3d 276,
282, superseded by statute on another point as stated in Kashani v. Tsann Kuen China Enterprise Co.
(2004)
118 Cal.App.4th 531,
541.) To accomplish that aim, section 7031 denies a contractor " 'access to the courts to recover for the fruits of
his labor . . . when he violates the statute.' [Citation.]" (Asdourian v. Araj, supra, at p. 282) {Slip Opn.
Page 5}
Section
7031, subdivision (a) reads in relevant part: "Except as provided in subdivision (e), no person engaged in the
business or acting in the capacity of a contractor, may bring or maintain any action, or recover in law or
equity in any action, in any court of this state for the collection of compensation for the performance of any
act or contract where a license is required by this chapter without alleging that he or she was a duly
licensed contractor at all times during the performance of that act or contract, regardless of the merits of
the cause of action brought by the person . . . ." (Italics added.)
If
proper licensure "is controverted," then the contractor must prove licensure by producing a verified certificate
of licensure from the Board establishing that the contractor bringing the action was duly licensed in the proper
classification at all times during the performance of any relevant contract. (§ 7031, subd. (d).)
Our
Supreme Court recently addressed the bar to recovery under section 7031, subdivision (a) in MW Erectors, Inc.
v. Niederhauser Ornamental & Metal Works Co., Inc. (2005)
36 Cal.4th 412 (MW
Erectors). There, MW Erectors had no license when it began performance of two subcontracts - one to
perform structural steel work, and another to perform ornamental steel work -- and only obtained a C-51 structural
steel contractor's license after commencing work. (Id. at pp. 419-420.) Referring to the language of section
7031 that " 'no person . . . may bring or maintain any action, or recover in law or equity in any action . . . for
the collection of compensation for the performance of any act or contract [requiring] a [contractor's] license'
unless he or she alleges (§ 7031(a)), and can prove (§ 7031, subd. (d)), his or her due licensure 'at all times'
during such performance (§ 7031(a))" the Supreme Court determined that "[t]he words 'at all times' convey the
Legislature's obvious intent to impose a stiff all-or-nothing penalty for unlicensed work by specifying that a
contractor is barred from all recovery for such an 'act or contract' if unlicensed at any time while
performing it." (MW Erectors, supra, at p. 426, certain italics added.) Reading the companion
{Slip Opn. Page 6} subdivisions of section 7031 together, all of which contain similar "at all times" and "act or
contract" language, the court explained, they "make clear the general rule denying recovery of all compensation for
work requiring a contractor's license if a valid license was not in place when performance began, or if
licensure lapsed at any time during the work." (MW Erectors, supra, at p. 428, italics omitted
and added.)
The
threshold question thus is whether, by virtue of its Class A license, Pacific was a "duly licensed contractor"
as required by section 7031, subdivision (a).
2.
Pacific's Class A license sufficed.
"
' "The licensing requirements provide minimal assurance that all persons offering such services in California
have the requisite skill and character, understand applicable local laws and codes, and know the rudiments of
administering a contracting business. [Citations.]" [Citation.]' " (Alatriste, supra, 183 Cal.App.4th at
p. 664)
The
Board is authorized to "adopt reasonably necessary rules and regulations to effect the classification of
contractors in a manner consistent with established usage and procedure as found in the construction business,
and may limit the field and scope of the operations of a licensed contractor to those in which he or she is
classified and qualified to engage, as defined by Sections 7055, 7056, 7057, and 7058." (§ 7059, subd. (a).)
Licenses "include[] any or all of the following branches: [¶] (a) General engineering contracting. [¶] (b)
General building contracting. [¶] (c) Specialty contracting." (§ 7055.)
A
Class A or general engineering contractor, is "a contractor whose principal contracting business is in
connection with fixed works requiring specialized engineering knowledge and skill, including the
following divisions or subjects: irrigation, drainage, water power, water supply, flood control, inland
waterways, harbors, docks and wharves, shipyards and ports, dams and hydroelectric projects, levees, river
control and reclamation works, railroads, highways, streets and roads, tunnels, airports and airways, sewers and
sewage disposal plants and systems, waste reduction plants, bridges, overpasses, underpasses and other similar
works, pipelines and other systems for the transmission of petroleum and other liquid or gaseous substances,
parks, playgrounds and other recreational works, refineries, chemical plants and similar industrial plants {Slip
Opn. Page 7} requiring specialized engineering knowledge and skill, powerhouses, power plants and other utility
plants and installations, mines and metallurgical plants, land leveling and earthmoving projects, excavating,
grading, trenching, paving and surfacing work and cement and concrete works in connection with the above
mentioned fixed works." (§ 7056, italics added.) The list of fixed works in section 7056 is not exhaustive.
(Ron Yates Construction Co. v. Superior Court (1986)
186 Cal.App.3d 337,
345-347 (Yates).)
In
contrast to a general contractor, "[a] specialty contractor is a contractor whose operations involve the
performance of construction work requiring special skill and whose principal contracting business involves the
use of specialized building trades or crafts." (§ 7058, subd. (a).) The California Code of Regulations further
subdivides specialty contracting work into subclassifications. (Cal. Code Regs., tit. 16, §§ 832.02-832.61.) As
is pertinent here, "[a]n earthwork and paving contractor digs, moves, and places material forming the surface of
the earth, other than water, in such a manner that a cut, fill, excavation, grade, trench, backfill, or tunnel
(if incidental thereto) can be executed, including the use of explosives for these purposes. This classification
includes the mixing, fabricating and placing of paving and any other surfacing materials." (Cal. Code Regs.,
tit. 16, § 832.12.)
Pacific
argues that its Class A general engineering contactor's license sufficed for this project and that the lesser or
specialty license would have been superfluous as it is fully encompassed within the Class A license
requirements. Bernards counters that the prime contract between the County and its engineers required that the
subcontractor performing the temporary excavation and support works have a Class C-12 specialty license, and
where Pacific did not hold a Class C-12 license, it was not duly licensed irrespective of Pacific's Class A
license. We agree with Pacific.
"
'[T]he interpretation and application of a statutory scheme to an undisputed set of facts is a question of law .
. . which is subject to de novo review on appeal[.]' [Citation.]" (Cal-Air Conditioning, Inc. v . Auburn
Union School Dist. (1993) {Slip Opn. Page 8}
21 Cal.App.4th 655,
667.) "A fundamental rule of statutory construction is that '[l]egislative intent should be determined from the
language of the statute.' [Citations.] Significance should be given, in doing so, to the section as a whole and to
every word, phrase or clause thereof, leaving no part or provision useless or deprived of meaning. [Citations.]"
(Yates, supra, 186 Cal.App.3d at p. 345) Moreover, " 'a regulation cannot restrict or enlarge the scope of a
statute. [Citations.]' [Citation.] [¶] 'Although the board was authorized to adopt rules and regulations "to effect
the classification of contractors," it is the statute which defines a contractor and [even] an
administrative ruling contrary to the terms thereof would be ineffective.' [Citations.]" (Id. at pp.
344-345.)
This
court addressed a very similar issue in Yates and our opinion provides important guidance here. Yates was
a Class A licensee, but did not hold a Class B license for construction of residences.
fn. 4 Yates contracted
to build a septic tank, a seawall, and a foundation consisting of eight caissons for a residence along the
shoreline in Malibu. (Yates, supra, 186 Cal.App.3d at pp. 340-341.) After Yates substantially
completed the work, the owners refused to pay and sued him for breach of contract. (Id. at p. 341.) At issue
was whether Yates could properly build a residence foundation with a Class A, but not a Class B license. Yates
argued that the work required specialized knowledge of a Class A licensee because of the unstable nature of the
land and the high water tables where the foundation must be anchored to the bedrock. (Id. at p. 340) We
agreed with Yates. (Id. at p. 348.)
We
based our reasoning on the statutory language of sections 7056 and 7057 concerning the Class A and Class B
licenses and on the legislative history. (Yates, supra, 186 Cal.App.3d at pp. 344-347.) We
concluded that while section 7056, defining a {Slip Opn. Page 9} general engineering contractor, did not contain
a finite list of the categories of fixed works (Yates, supra, at pp. 345-347), it modified the type of
fixed works by specifying that such works "requir[e] specialized engineering knowledge and skill."
(Ibid.) We also reviewed the test for Class A licensees and discovered it included knowledge of
foundation work whereas the test for a Class B license did not. (Id. at pp. 347-348.) Accordingly, we
held "that a general engineering contractor which possesses a Class A license may contract to construct a
foundation for a residence if it requires 'specialized engineering knowledge and skill' (§ 7056)" and so the
trial court erred in ruling that Yates was not properly licensed to build the caisson foundation for the
homeowners' residence. (Id. at p. 348.) According to Yates, a fixed work "requiring specialized
engineering knowledge and skill" falls within the scope of work of a Class A licensee. (Id. at pp.
345-347.)
Comparing
a Class A and Class C-12 license, "specialized engineering knowledge and skill" is not required of the
latter. (§ 7058; Cal. Code Regs., tit. 16, § 832.12; see People v. Vis (1966)
243 Cal.App.2d 549,
553 [construction industry embraces numerous specialized crafts requiring certain arts and skills falling in
"specialty contractor" classification].) Nowhere in the Board's definition of an earthmoving and paving contractor
is specialized engineering knowledge or skill mentioned. Reviewing the Board-published study guides for Class A and
Class C-12 contractors state license examinations, and the Board's job descriptions for these licensees, as we did
in Yates (Yates, supra, 186 Cal.App.3d at pp. 347-348), these publications indicate that
although a Class A contractor is required to have knowledge of basic engineering principles and seismic safety,
shoring and sloping, a Class C-12 licensee is not.
Furthermore,
Class A licensees are permitted to engage in the same work as the Class C-12 license. Section 7056 includes in
its list of activities of a Class A licensee "leveling and earthmoving projects, excavating, grading, trenching,
paving and surfacing work and cement and concrete works" when done in connection with fixed works requiring
specialized engineering knowledge and skill. (§ 7056.) Thus, although both the Class A and Class C-12
contractors may dig and pave, only Class A licensee may {Slip Opn. Page 10} engage in land leveling and
earthmoving, excavation, grading, and trenching when it demands "specialized engineering knowledge and skill."
Stated otherwise, a general engineering contractor who possess a Class A license may contract to provide
temporary excavation and support requiring "specialized engineering knowledge and skill[.]" (§ 7056;
Yates, supra, 186 Cal.App.3d at p. 348.)
Comparing
Pacific's subcontract to the words of section 7056 and title 16, California Code of Regulations, section 832.12,
the subcontract required "specialized engineering knowledge and skill[.]" Pacific was expected to provide
"calculations that clearly disclose such information as interpreted subsurface conditions and geotechnical
design parameters, factors of safety, assumptions, design criteria, overstress values and
serviceability/deflection tolerances." Along with these calculations, Pacific was also to provide temporary
support, which is not within the expertise of a Class C-12 contractor. The subcontract required of Pacific
activities that fall beyond the purview of the Class C-12 contractor but within expertise of the Class A
licensee. (§ 7056.) Therefore, Pacific's Class A license enabled it to provide temporary excavation and support
for the hospital project because it required Pacific to utilize specialized engineering knowledge and skill and
provide more than those activities falling under the definition of a Class C-12 license. (§ 7056.)
Bernards
argues that Yates and other cases Pacific cites did not address the narrow question presented here
namely, whether the holder of a Class A license was also required to obtain a Class C-12 specialty
license, and so Pacific's cases are not authority for a proposition not discussed. (Amwest Surety Ins. Co. v.
Wilson (1995)
11 Cal.4th 1243,
1268.) But, Yates interpreted section 7056 and held that fixed works under that statute are those that
require specialized engineering knowledge and skill. Our reading of the Class C-12 license in title 16, California
Code of Regulations, section 832.12 dovetails with section 7056 and Yates. Insofar as a subcontractor is
engaged in digging as well as excavating, backfilling, and grading, and providing support in connection with fixed
works that require specialized engineering knowledge and skill, a Class A license will suffice. {Slip Opn. Page 11}
Next,
Bernards argues that Ventura County, as a public agency authorized to select which license classification was
entitled to perform this project, required Pacific to hold a Class C-12 license. As Pacific did not hold the
license the County had designed, it was not duly licensed as provided for by the statute.
Section
7059 provides in part, "In public works contracts . . . the awarding authority shall determine the license
classification necessary to bid and perform the project." (§ 7059, subd. (b), italics added.) This statute
was sponsored by the Board "to clarify when contracts could be let to specialty contractors where the
contract involved work outside the specialty contractor's license. [Citation.]" (M & B
Construction v. Yuba County Water Agency (1999)
68 Cal.App.4th 1353,
1360-1361 (M & B Const.), italics added.)
The
authorities upon which Bernards relies are distinguished as they all involve the bidding process. (See, e.g.,
M & B Const., supra, 68 Cal.App.4th at p. 1362 [§ 7059, subd. (b) grants Agency the right to
consider license classifications in determining whether a bidder is qualified to bid on contract].) Furthermore,
M & B Const. is distinguished because, as noted, Pacific's subcontract did not involve work outside
its contractor's license. (M & B Const., supra, at pp. 1360-1361.) In any event, the decision
of a public agency goes to its own dealings with the contractor with whom it contracts and has no impact on
contractors' dealings with third parties. (Id. at p. 1362.) Here, based on our holding that a
Class A license sufficed in this case, it is irrelevant that Pacific did not hold a Class C-12 license. The
requirement of a C-12 license was located in the prime contract between the County of Ventura and Bernards.
Bernards observes that the subcontract contained a provision incorporating the prime contract and reciting that
Pacific certified that it is fully familiar with all of the terms, conditions, and obligations of the prime
contract. But, the authority of the public agency to select which license classification could perform this
project extends only to its dealings with its own contracts. (Ibid.)
To
summarize, Pacific had a valid California contractor's license when it began work under the subcontract. {Slip
Opn. Page 12}
3.
Trial is necessary to determine whether Pacific substantially complied with the licensing requirement.
Bernards
contends, even if Pacific's Class A license was sufficient, that that license was suspended and expired during
suspension while Pacific was performing its work, with the result that Pacific is precluded from recovering on
its subcontract because it was not duly licensed "at all times during the performance of" the subcontract as
required by section 7031, subdivision (a) and MW Erectors, supra,
36 Cal.4th 412.
This issue was raised and argued below. However, because the court ruled against Pacific on the ground it lacked a
proper license at all (§ 7031, subd. (a)), the court never addressed the issue of whether Pacific could recover in
any event because it was in substantial compliance with the licensing requirement under section 7031, subdivision
(e). We conclude that reversal is required to allow Pacific the opportunity to establish it satisfied the elements
of substantial compliance.
Pacific
entered into its subcontract on April 3, 2002 and performed under that contract in 2002 and 2003. The version of
section 7031 in effect at those times "provided that the doctrine of substantial compliance could apply only
when, among other things, the contractor, despite a later lapse in licensure, 'had been duly licensed as
a contractor in this state prior to the performance of the act or contract' for which compensation is
sought. [Citation.]" (MW Erectors, supra, 36 Cal.4th at p. 431, first italics added, citing Stats.
1994, ch. 550, § 1, p. 2803; see also Stats. 2001, ch. 226, § 1.)
Specifically,
at that time, section 7031, former subdivision (e) read in relevant part: "The judicial doctrine of substantial
compliance shall not apply under this section where the person who engaged in the business or acted in the
capacity of a contractor has never been a duly licensed contractor in this state. However, the court may
determine that there has been substantial compliance with licensure requirements under this section if it is
shown at an evidentiary hearing that the person who engaged in the business or acted in the capacity of a
contractor (1) had been duly licensed as a contractor in this state prior to the performance of the act or
contract, (2) acted reasonably and in good faith to maintain proper licensure, and (3) did not know or
reasonably should not have known {Slip Opn. Page 13} that he or she was not duly licensed." (§ 7031, former
subd. (e), Stats. 2001, ch. 226, § 1; accord, MW Erectors, supra, 36 Cal.4th at p. 431.)
fn. 5 The elemental
requirements of substantial compliance are stated in the conjunctive, indicating the contractor seeking payment
must demonstrate it satisfied all of the statutory elements to be entitled to recovery. (See County of
Colusa v. California Wildlife Conservation Bd. (2006)
145 Cal.App.4th 637,
648 [where criteria are stated in the conjunctive all of the criteria must be met].) Application of the substantial
compliance doctrine is a factual issue. (§ 7031, subd. (e) ["the court may determine that there has been
substantial compliance with licensure requirements under this section if it is shown at an evidentiary hearing . .
. ."]; ICF Kaiser Engineers, Inc. v. Superior Court (1999)
75 Cal.App.4th 226,
236.)
The
Legislature amended section 7031, subdivision (e) effective 2003 "to provide that one may establish substantial
compliance, despite being unlicensed at some time during performance, if he or she (1) 'had been duly
licensed . . . prior to . . . performance . . . , (2) acted reasonably and in good faith to maintain proper
licensure, (3) did not know or reasonably should not have known that he or she was not duly licensed when
performance of the act or contract commenced, and (4) acted promptly and in good faith to reinstate his or her
license upon learning it was invalid.' " (MW Erectors, supra, 36 Cal.4th at p. 434, italics added
and omitted, citing Stats. 2003, ch. 289, § 1.)
fn. 6 {Slip Opn. Page
14}
However,
as the Supreme Court noted, "[i]n an uncodified section of the 2003 amendments, the Legislature '[found] and
declare[d] that the changes made by this act do not constitute a change in, but are declaratory of, existing
law.' [Citation.]" (MW Erectors, supra, 36 Cal.4th at p. 434, citing Stats. 2003, ch. 289, § 2.)
MW Erectors determined "the 2003 amendment seems entirely consistent with the prior statutory expression
of the substantial compliance doctrine. No reason appears to reject the Legislature's assurance that the
amendment merely clarified, and did not change, existing law." (Ibid.)
Two
cases involving the doctrine of substantial compliance where the contractor's license lapsed during the
performance of the contract are instructive. The contractor in Slatkin v. White (2002)
102 Cal.App.4th 963,
was licensed when he commenced work on the contract. Two years into the project, he received notice that his
license had been {Slip Opn. Page 15} suspended four months earlier because of the cancellation of a bond.
(Id. at p. 966.) The contractor's failure to obtain reinstatement of the license for six months after the
notice of suspension was the fault of the construction bond market. (Id. at p. 967.) Under those facts, the
contractor demonstrated substantial compliance. (Id. at p. 971.)
In
Pacific Custom Pools, Inc. v. Turner Construction Co. (2000)
79 Cal.App.4th 1254,
the appellate court affirmed the finding of no substantial compliance, not because of the lapse, but because of a
lack of good faith. There the evidence showed, although licensed before commencing work on the project (id.
at pp. 1258, 1262), that the contractor knew its license was suspended during performance for failure to file a
judgment bond. (Id. at p. 1264.) Also, the contractor's renewal application was untimely and its check was
dishonored. (Ibid.) Such facts did not indicate that the contractor acted reasonably or in good faith to
maintain licensure or that it did not know or reasonably should not have known that it was not duly licensed.
(Ibid.)
Applying
these principles here, Pacific was duly licensed as a contractor in this state prior to the performance of the
act or contract. As we have already discussed, Pacific held a valid Class A license until April 1, 2003. That
license sufficed for this subcontract. Thus, Pacific held a valid California contractor's license prior to
performance of the subcontract.
However,
as the result of its ruling granting judgment based on subdivision (a) of section 7031, the trial court never
reached the doctrine of substantial compliance. The record is devoid of facts indicating whether Pacific
(1) acted reasonably and in good faith to maintain proper licensure, (2) did not know or reasonably should not
have known that he or she was not duly licensed, and (3) acted promptly and in good faith to reinstate his or
her license upon learning it was invalid. (§ 7031, subd. (e).) Stated differently, the record does not support
the trial court's judgment pursuant to Code of Civil Procedure section 631.8. This case must be reversed for
trial of the substantial compliance doctrine under section 7031, subdivision (e). Accordingly, that portion of
the judgment ordering Pacific to disgorge the $206,437.91 Bernards had paid it must also be reversed. {Slip Opn.
Page 16}
DISPOSITION
The
judgment is reversed and remanded to the trial court in accordance with the opinions expressed herein. Appellant
to recover costs on appeal.
Croskey,
Acting P. J., and Kitching, J., concurred.
FN 1. All
further statutory references are to the Business and Professions Code, unless otherwise noted.
FN 2. The
portion of the prime contract entitled "Temporary Excavation and Support Works" stated in relevant part, "1.03
QUALIFICATIONS [¶] A. Temporary Works Designer and Contructor (Contractor): Company specializing in temporary
support design and construction with a minimum [10] years documented experience. A California Contractor's State
License Board Class C-12 license is required." (Italics added.) The Prime Contract was incorporated into the
subcontract.
FN 3. Similar
to a nonsuit motion under Code of Civil Procedure section 581c, section 631.8 reads in pertinent part: "After a
party has completed his presentation of evidence in a trial by the court, the other party . . . may move for a
judgment. The court as trier of the facts shall weigh the evidence and may render a judgment in favor of the moving
party . . . . Such motion may also be made and granted as to any cross-complaint. [¶] . . . [¶] If the motion is
granted, unless the court in its order for judgment otherwise specifies, such judgment operates as an adjudication
upon the merits."
FN 4. A
Class B or general building contractor is a "contractor whose principal contracting business is in connection with
any structure built . . . for the support, shelter, and enclosure of persons, animals, chattels, or movable
property of any kind, requiring in its construction the use of at least two unrelated building trades or crafts, or
to do or superintend the whole or any part thereof." (§ 7057, subd. (a).)
FN 5. Other
than redesignating subdivision (d) as subdivision (e), the 2001 amendments made no "substantive change[s]" to this
provision. (MW Erectors, supra, 36 Cal.4th at p. 434, fn. 13.)
FN 6. The
Legislature has been grappling with the substantial compliance doctrine in the construction context. In 1989 the
Legislature indicated its displeasure with the judicially developed doctrine of substantial compliance under
section 7031 by abrogating the rule. (MW Erectors, supra, 36 Cal.4th at p. 429 & fn. 8, citing
Stats. 1989, ch. 368, § 1, p. 1509.) By 2003, the Legislature had become concerned because "the lack of a
substantial compliance defense exposes good, honest contractors to potentially devastating financial losses simply
because the contractor was unaware that his/her license had temporarily lapsed. The lapse could occur for a number
of innocent reasons that are unknown and beyond the control of the contractor. [¶] Currently, a lapse of license
for even a single day could lead to the owner's recovery of 100 percent of the compensation paid to the contractor
for work performed." (Sen. Rules Com., Off. of Sen. Floor Analyses, 3d reading analysis of Assem. Bill No. 1386
(2003-2004 Reg. Sess.) as amended July 23, 2003, p. 2.) Assembly Bill No. 1386 was introduced to "soften[]" "the
flat no-substantial-compliance rule . . . to allow contractors to establish substantial compliance in certain
circumstances, and therefore to recover compensation, despite technical lapses in licensure. [Citation.]" (MW
Erectors, supra, 36 Cal.4th at p. 429, fn. 8) The comment specified that while "[c]ontractors who know
they are unlicensed when they commence work on a project would not be able to assert a substantial compliance
defense. . . . contractors who commence work in good faith and later learn of a lapse of license, and then act
promptly to reinstate their license, could defend an action by the owner to recover compensation if they meet the
other substantial compliance tests." (Sen. Rules Com., Off. of Sen. Floor Analyses, 3d reading analysis of Assem.
Bill No. 1386, supra, pp. 2-3.)
The
2003 amendments sought, among other things, to "[e]xpand[] the definition of activities not deemed as
'substantial compliance' to include performance of work with an inactive license, a revoked license, or a
license suspended by disciplinary action of the Contractors' State License Board . . . ." (Sen. Rules Com., Off.
of Sen. Floor Analyses, Summary of Assem. Bill No. 1386 (2003-2004 Reg. Sess.) as amended July 23, 2003, p. 1.)
Comments showed that to defend against a court action to disgorge compensation for work performed, the
contractor must demonstrate that it was not responsible for the lapse in licensure and that he or she acted in
good faith and promptly moved to reinstate the license. (Assem. Com. on Judiciary, Analysis of Assem. Bill. No.