Pine
Terrace Apartments, L.P. v. Windscape, LLC (2009), Cal.App.4th
[No.
F054609. Fifth Dist. Jan. 12, 2009.]
PINE
TERRACE APARTMENTS, L.P., Plaintiff and Appellant, v. WINDSCAPE, LLC, et al., Defendants, Cross-complainants and
Appellants; JEFFREY SCOTT, INC., et al., Cross-defendants and Respondents.
[Opinion
certified for partial publication. fn.
* ]
(Superior
Court of Fresno County, No. 04CECG01462, Alan M. Simpson, Judge.)
(Opinion
by Dawson, J., with Levy, Acting P.J., and Hill, J., concurring.)
COUNSEL
Flynn/Williams,
Robert P. Hall, Jr., and Stephen M. Flynn for Plaintiff and Appellant.
Cooper
& Hoppe, Theodore W. Hoppe and Brian H. O'Driscoll for Defendants, Cross-complainants and Appellants.
Myers
& Mayfield, Lori R. Mayfield, Michelle E. Sassano; Elie & Associates, Susan F. Leonard; Law Office of
Zinkin & Bruce, and Daniel A. Bruce for Cross-defendants and Respondents. {Slip Opn. Page 2}
OPINION
DAWSON,
J.-
This
appeal involves allegations of latent construction defects and the application of the 10-year statute of
limitations set forth in Code of Civil Procedure section 337.15. fn.
1
The
buyer of an apartment complex sued the developer and seller after discovering that all of the windows in the
complex lacked flashing, which led to water and mold damage. The developer and seller filed a cross-complaint
for indemnification against various subcontractors.
Three
subcontractors moved for summary judgment on the cross-complaint on the ground it was barred by section 337.15.
The superior court granted their motions. The developer and seller, as well as the buyer, appealed.
We
reach the following conclusions. First, the exemption from the 10-year statute of limitations for "actions based
on willful misconduct" (§ 337.15, subd. (f)) applies to cross-complaints for indemnity. Second, a willful
misconduct claim may be made in a cross-complaint by way of incorporating by reference allegations contained in
the complaint. Third, because of these two conclusions and because triable issues of material fact regarding the
willful misconduct claim are present here, the trial court erred in granting the subcontractors' motions for
summary judgment.
Accordingly,
the judgment will be reversed and the matter remanded for further proceedings.
FACTS
Parties
Plaintiff
Pine Terrace Apartments, L.P. (Buyer), is a California limited partnership. Buyer purchased a 256-unit apartment
complex located at 353 and 373 West Nees Avenue, Fresno, California, commonly known as the Windscape Apartments
(Apartments). Cal-Neva Asset Management Co., Inc. is the general partner of Buyer. {Slip Opn. Page 3}
Defendants
and cross-complainants are (1) Windscape, LLC, a Washington limited liability company; (2) Windscape, L.P., a
California limited partnership; (3) Andrade Development Company, a California corporation; and (4) Eugene J.
Andrade, an individual who is (a) the managing member of Windscape, LLC, (b) the general partner of Windscape,
L.P., and (c) the president of Andrade Development Company. For purposes of this opinion, these four parties
will be referred to collectively as Developer-Seller.
Windscape,
L.P. was the original owner and developer of the Apartments. Andrade Development Company was the general
contractor and builder. Windscape, L.P. transferred the Apartments to Windscape, LLC, which became the owner of
record of the Apartments.
Cross-defendants
are (1) Jeffrey Scott, Inc., doing business as Western Products Co. (Western), (2) Avila Cement, and (3)
Weber-Iness Associates (collectively, Subcontractors).
Apartments
Construction
of the Apartments began in 1989 and ended in 1991. Weber-Iness Associates, an architecture firm, contracted to
prepare the plans for the construction of the Apartments. The written contract for the architectural services to
be provided by Weber-Iness Associates expressly excluded any construction or supervision of construction.
Avila
Cement contracted with Developer-Seller to supply concrete foundations and flatwork for the Apartments.
Western
manufactured and installed the windows for the Apartments pursuant to an oral agreement with Developer-Seller.
Western admits that it installed the windows without flashing paper, but asserts that its work complied with the
building code and with the standard practice at that time. {Slip Opn. Page 4}
A
notice of completion for the 373 West Nees parcel was recorded with the Fresno County Recorder's Office on
October 31, 1990. The notice of completion for the 353 West Nees parcel was recorded on May 1, 1991.
In
2002, Buyer and Developer-Seller entered agreements for the sale of the Apartments. Escrow for the sale closed
on May 13, 2003.
Alleged
Defects
Buyer
alleges that, after the sale, it became aware of numerous and pervasive defects and damage throughout the
Apartments. The alleged defects include damaged and defective roofing, balconies, flashing, trim, pavement, and
sidewalks. Buyer expressed particular concern with water and mold damage caused by the absence of any flashing
around all windows in the Apartments. Buyer asserts that Eugene J. Andrade knew flashing had not been installed
at the Apartments and did not disclose the absence of flashing to Buyer.
Buyer
presented the opinion of Adam Posard regarding the absence of flashing. Posard is licensed by California as an
architect and a general building contractor. Posard inspected the Apartments and viewed photographs taken by an
architect and contractor who performed repairs to the Apartments in 2006. Posard stated that flashing has been
used by builders for generations and is required by the Uniform Building Code. He stated his opinion that "the
only reason the General Contractor and its subcontractors would omit the required flashing is to save money, at
the expense and harm to any subsequent purchaser of the property." In Posard's opinion, the omission of the
flashing was the result of willful misconduct.
In
its separate statement, Western asserted that its "installation of the windows without flashing paper was open
and obvious to any person monitoring, inspecting or working on the job site." Developer-Seller disputed this
assertion of fact, contending that the omission was not open and obvious because Eugene J. Andrade "had no
knowledge that flashing paper could be installed around windows until after the pending case was {Slip Opn. Page
5} filed." In contrast, Buyer did not dispute Western's assertion of fact but made evidentiary objections to the
declarations Western filed to support its assertion.
Western's
moving papers and the opposition papers indicate that the parties dispute (1) whether Western's installation of
windows complied with the Uniform Building Code and the City of Fresno Building Code and (2) whether, at the
time of installation, the City of Fresno required flashing paper to be installed with the windows. Those papers
also establish, and the parties do not dispute, that City of Fresno officials inspected and approved the window
installation, although Buyer objected to the evidence Western submitted to support this fact.
PROCEEDINGS
Pleadings
Buyer
filed a complaint against Developer-Seller and Does 1 through 1000 on May 17, 2004. On October 15, 2004, Buyer
filed a first amended complaint (FAC) that included claims for negligence, strict liability, breach of contract,
breach of implied and express warranty, bond liability, express contractual indemnity, and concealment arising
out of the construction and sale of the Apartments.
Buyer
alleged that Developer-Seller and the Doe defendants defectively built the Apartments and their work was so
defective that it "was of a quality amounting to reckless disregard and/or willful misconduct."
Developer-Seller
filed a cross-complaint, naming as cross-defendants over a dozen subcontractors that worked on the Apartments,
including Western, Avila Cement and Weber-Iness Associates. Developer-Seller's operative pleading against the
Subcontractors is its first amended cross-complaint for declaratory relief, implied equitable indemnity, and
express contractual indemnity, which was filed October 6, 2006 (Cross-Complaint).
The
Cross-Complaint does not use the term "willful misconduct," but does incorporate by reference the allegations of
the FAC. Further details regarding the allegations of the FAC and the Cross-Complaint are set forth in part
III.B, post. {Slip Opn. Page 6}
Motions
for Summary Judgment
In
February 2007, Developer-Seller and Western both filed motions for summary judgment. Developer-Seller asserted
the claims in Buyer's FAC were barred by the 10-year statute of limitations set forth in section 337.15.
Similarly, Western asserted Developer-Seller's Cross-Complaint against it was barred by section 337.15 because
the FAC and Cross-Complaint were filed more than 10 years after completion of the Apartments.
The
superior court chose to hear Developer-Seller's motion for summary judgment before Western's motion for summary
judgment.
Developer-Seller's
Motion
Buyer
opposed Developer-Seller's motion for summary judgment by contending that the 10-year limitations period does
not apply (1) in cases of willful misconduct, (2) to persons in actual possession or control of the property at
any time a defect proximately causes damage to the property, or (3) in cases of fraudulent concealment. Buyer
also disputed that notices of completion were filed in 1990 and 1991 on the grounds that the notices constituted
hearsay and had not been properly authenticated, and that judicial notice could not be taken of their contents.
Buyer
also submitted the declaration of Posard to support its argument that a triable issue of material fact existed
regarding whether Developer-Seller's actions constituted willful misconduct.
In
May 2007, the superior court determined (1) Developer-Seller had not met its burden of establishing when the
Apartments were substantially completed and (2) triable issues of material fact existed regarding the willful
misconduct exemption and the owner-in-possession exemption from the 10-year statute of limitations.
Specifically, the court stated Buyer raised a triable issue of fact regarding whether Developer-Seller's failure
to install flashing amounted to willful misconduct. The court denied Developer-Seller's motion for summary
judgment but granted summary adjudication as to four of the 13 causes of action in the FAC. {Slip Opn. Page 7}
Subcontractors'
Summary Judgment Motions
In
June 2007, the superior court heard the Subcontractors' motions for summary judgment. The court sustained
evidentiary objections regarding foundation and authenticity made by Developer-Seller to the copies of the
notices of completion submitted by the Subcontractors in support of their motions. Based on its evidentiary
rulings regarding the notices of completion, the court concluded that the Subcontractors had failed to establish
that the 10-year limitations period expired before the filing of the complaint. Therefore, the court denied the
Subcontractors' motions for summary judgment.
On
July 2, 2007, Avila Cement filed a petition for a writ of mandate with this court (Avila Cement v. Superior
Court, F053192), asserting that the superior court had erred by excluding the notice of completion from
evidence. On July 10, 2007, this court issued an alternative writ directing the superior court either to show
cause why the requested relief should not issue or to (1) set aside its June 2007 order denying the motion to
take judicial notice and its related order denying Avila Cement's motion for summary judgment; (2) grant the
motion for judicial notice; and (3) thereafter, reconsider the motion for summary judgment.
On
July 20, 2007, the superior court responded to the alternative writ by taking judicial notice of the notices of
completion and finding the Apartments were substantially completed on October 31, 1990, and May 1, 1991. Based
on this finding and the filing dates of the pleadings, the court concluded the statute of limitations had run on
the Cross-Complaint. It then granted the three Subcontractors' motions for summary judgment.
In
August 2007, Developer-Seller filed a motion for reconsideration of the order granting the Subcontractors'
motions for summary judgment. Buyer attempted to join in the motion for reconsideration. Both Developer-Seller
and Buyer argued the superior court had failed to consider the willful misconduct exception to the 10-year
limitations period. {Slip Opn. Page 8}
The
superior court denied the motion for reconsideration based on procedural grounds and the following three
conclusions. First, Developer-Seller could not rely on the exemption in section 337.15, subdivision (f) because
the Cross-Complaint made no allegations of willful misconduct. Second, Developer-Seller provided no evidence
that the Subcontractors were guilty of willful misconduct or concealment. Third, section 337.15, subdivision (f)
does not apply to cross-complaints for indemnity.
Both
Buyer and Developer-Seller challenged the order granting Subcontractors' motions for summary judgment by filing
petitions for writs of mandate with this court. Both petitions were summarily denied.
Motion
for Fees and Costs
In
August 2007, Avila Cement, having prevailed on its motion for summary judgment, filed a motion for attorney fees
and costs pursuant to section 1038. The motion asserted Developer-Seller's Cross-Complaint was brought and
maintained without good faith or reasonable cause.
In
September 2007, Weber-Iness Associates also filed a motion for attorney fees and costs pursuant to section 1038.
The
superior court granted the section 1038 motions for attorney fees and costs. It awarded Avila Cement $21,233.64
and Weber-Iness Associates $31,278.75.
Appeal
Buyer
asserts that its appeal challenges the July 20, 2007, order granting Western's motion for summary judgment.
Developer-Seller's
notice of appeal challenges the July 20, 2007, order granting the three Subcontractors' motions for summary
judgment, and the related judgment, as well as the orders and judgment awarding Avila Cement and Weber-Iness
Associates attorney fees and costs pursuant to section 1038. {Slip Opn. Page 9}
DISCUSSION
I.
Standard of Review fn.
*
A.
Independent Review
A
motion for summary judgment raises only questions of law. (Millard v. Biosources, Inc.
(2007)
156 Cal.App.4th 1338,
1345.) Appellate courts answer the questions of law after conducting an independent review of the parties'
supporting and opposing papers. (Id. at pp. 1345-1346.) The two primary questions of law are (1) whether a
triable issue of material fact exists and (2) whether the moving party is entitled to summary judgment as a matter
of law. (§ 437c, subd. (c); Merrill v. Navegar, Inc. (2001)
26 Cal.4th 465,
476.)
B.
Three-Step Analysis Under Brantley
In
Brantley v. Pisaro (1996)
42 Cal.App.4th 1591 (Brantley),
this court stated that "we apply the same three-step analysis required of the trial court" during our appellate
review of the merits of a summary judgment motion. (Id. at p. 1602.)
1.
Step one
Step
one requires us to identify the issues framed by the pleadings and determine whether the motion responds to
those issues. (Brantley, supra, 42 Cal.App.4th at p. 1602.) The issues framed by the pleadings
depend on the theory or theories of recovery fn.
2 asserted in the claimant's pleading and the affirmative defenses raised in the responding
party's answer.
A
moving party satisfies this step by presenting a motion that attempts to "establish[] a complete defense or
otherwise show[] there is no factual basis for relief on any theory reasonably contemplated by the opponent's
pleading." (AARTS Productions, Inc. v. Crocker National Bank (1986)
179 Cal.App.3d 1061,
1064.) {Slip Opn. Page 10}
Conversely,
a moving party fails to satisfy this step when the motion for summary judgment does not respond to and negate
all theories reasonably contemplated by the opponent's pleading. In that situation, the motion cannot be granted
because the moving party has failed to show it "is entitled to a judgment as a matter of law." (§ 437c, subd.
(c).)
Step
one is significant in this appeal because of the controversy over whether the Cross-Complaint presented the
theory that the Subcontractors' actions constituted willful misconduct. (See pt. III., post.)
2.
Step two
Step
two involves determining whether the moving party has satisfied its initial burden of producing admissible
evidence "to make a prima facie showing of the nonexistence of any triable issue of material fact ...."
(Aguilar v. Atlantic Richfield Co. (2001)
25 Cal.4th 826,
850; see Brantley, supra, 42 Cal.App.4th at p. 1602.) A triable issue of fact exists when the
evidence reasonably would permit the trier of fact, under the applicable standard of proof, to find the purportedly
contested fact in favor of the party opposing the motion. (Aguilar, supra, at p. 850.)
A
moving party defendant can carry this initial burden by negating one or more elements of a cause of action or by
establishing an affirmative defense to a cause of action. (§ 437c, subd. (o); Aguilar v. Atlantic
Richfield Co., supra, 25 Cal.4th at p. 853.)
3.
Step three
If
the moving party meets this initial burden, the court proceeds to step three. (Brantley, supra, 42
Cal.App.4th at p. 1602.) Under step three, the burden shifts to the opposing party to show the existence of a
triable issue of material fact. (§ 437c, subd. (p)(2).)
II.
The 10-Year Limitations Period and Willful Misconduct Exemption
A.
Statutory Provisions
Section
337.15 provides in relevant part: {Slip Opn. Page 11}
"(a)
No action may be brought to recover damages from any person ... who develops real property or performs or
furnishes the design ... or construction of an improvement to real property more than 10 years after the
substantial completion of the development or improvement for any of the following: [¶] (1) Any latent deficiency
in the design ... or construction of an improvement to, or survey of, real property. [¶] (2) Injury to property,
real or personal, arising out of any such latent deficiency."
This
10-year limitations period is subject to exemptions. For example, subdivision (c) of section 337.15 states:
"As
used in this section, 'action' includes an action for indemnity brought against a person arising out of that
person's performance or furnishing of services or materials referred to in this section, except that a
cross-complaint for indemnity may be filed pursuant to subdivision (b) of Section 428.10 in an action which has
been brought within the time period set forth in subdivision (a) of this section." fn.
3
Subdivision
(f) of section 337.15 provides: "This section shall not apply to actions based on willful misconduct or
fraudulent concealment."
B.
Contentions of the Parties
Buyer
contends the superior court erred in concluding the exemption contained in subdivision (f) of section 337.15
does not apply to cross-complaints for indemnity. Buyer and Developer-Seller argue the term "action" used in
subdivision (f) of section 337.15 should be interpreted to include cross-complaints for indemnity.
In
contrast, Subcontractors contend that they are protected by the 10-year limitations period set forth in section
337.15. In addition to arguing in favor of the superior court's interpretation of subdivision (f), they assert
the willful misconduct exemption does not apply to Developer-Seller's Cross-Complaint for indemnity because that
pleading did not specifically allege willful misconduct. {Slip Opn. Page 12}
C.
Analysis
1.
Background on section 337.15
Generally,
a lawsuit alleging a latent construction defect must be brought within three or four years (depending on the
theory of recovery) after the plaintiff discovers, or should have discovered, the defect. (Lantzy v. Centex
Homes (2003)
31 Cal.4th 363,
366 (Lantzy).) In 1971, the Legislature capped the open-ended nature of this discovery rule by enacting
section 337.15, which "established a further general rule that no action for latent construction defects may be
commenced more than 10 years after 'substantial completion' of the construction project. [Citation.] This
'absolute' 10-year limitations period applies regardless of when the defect was discovered." (Lantzy, at p.
366, fn. omitted.)
The
California Supreme Court's use of quotation marks around the word "absolute" in Lantzy indicates that the
10-year limitations period cannot be regarded as absolute in all contexts. For example, "[s]ection 337.15 itself
provides several clear exemptions from the 10-year limit" (Lantzy, supra, 31 Cal.4th at p. 373),
and our high court has recognized that a party might be equitably estopped from asserting that the 10-year
period has expired. (Id. at p. 367.)
The
two statutory exemptions relevant to our analysis are contained in subdivisions (c) and (f) of section 337.15.
2.
Case law
Both
Buyer and Developer-Seller rely on Acosta v. Glenfed Development Corp. (2005)
128 Cal.App.4th 1278 (Acosta)
in support of their interpretation of subdivision (f) of section 337.15.
In
Acosta, the plaintiffs sued a developer/general contractor for construction defects in their homes. The
developer/general contractor, in turn, sued various subcontractors for indemnification and on other theories.
(Acosta, supra, 128 Cal.App.4th at p. 1285.) The developer/general contractor moved for summary
judgment on the ground that the plaintiffs' complaint was filed more than 10 years after substantial {Slip Opn.
Page 13} completion of their homes. The trial court determined that subdivision (f) of section 337.15 did not
apply and granted the developer/general contractor's motion. (Acosta, supra, at p. 1285.) As a
result, the trial court also granted the subcontractors' motion for summary judgment; the subcontractors could
not be liable for indemnification when the developer/general contractor had prevailed against the plaintiffs.
(Id. at pp. 1286-1287.)
The
court of appeal reversed the trial court's order granting the developer/general contractor's motion for summary
judgment. (Acosta, supra, 128 Cal.App.4th at p. 1304.) The court concluded there was sufficient
evidence in the record that a trier of fact could find (1) the subcontractors engaged in acts of willful
misconduct in the construction of the plaintiffs' homes and (2) the facts and circumstance justified charging
the developer/general contractor with the subcontractors' willful misconduct. (Id. at pp. 1301-1302.) The
court partially based its conclusion on the declarations of the plaintiffs' experts. Those declarations
identified many alleged defects, stated that the defects involved conspicuous failures to comply with the
building code, and expressed the opinion that the defects could not be present without the tacit or express
approval of the developer/general contractor. (Id. at pp. 1288-1289.)
The
court also reversed the summary judgment in favor of the subcontractors on the ground that the reinstatement of
the plaintiffs' claim against the developer/general contractor created the possibility that the subcontractors
would be liable to indemnify the developer/general contractor. (Acosta, supra, 128 Cal.App.4th at
p. 1303.) The court of appeal declined to consider the substantive arguments raised by the subcontractors in
support of their motions, concluding that the trial court should address those arguments in the first instance.
(Id. at p. 1304.)
Because
the court in Acosta did not address the merits of the subcontractors' motions, we conclude that it did
not actually decide whether the exemption in subdivision (f) of section 337.15 applied to cross-complaints for
indemnity that alleged willful misconduct. {Slip Opn. Page 14}
Furthermore,
the parties have cited, and we have located, no published opinion by a California court that has decided this
issue of statutory construction.
3.
Application of statutory definitions
We
will determine the meaning of subdivision (f) of section 337.15 by referring to various definitions set forth in
the Code of Civil Procedure.
First,
we return to subdivision (c) of section 337.15 because it appears to provide a partial definition of the word
"action." Subdivision (c) states in full:
"As
used in this section, 'action' includes an action for indemnity brought against a person arising out of that
person's performance or furnishing of services or materials referred to in this section, except that a
cross-complaint for indemnity may be filed pursuant to subdivision (b) of Section 428.10 in an action which has
been brought within the time period set forth in subdivision (a) of this section." fn.
4
The
California Supreme Court has interpreted the first portion of subdivision (c) of section 337.15 to refer only to
direct actions for indemnity. (Valley Circle Estates v. VTN Consolidated, Inc. (1983)
33 Cal.3d 604,
611.) It has interpreted the second portion of subdivision (c)--the portion that begins "except that"--as "clearly
allow[ing] those parties who cannot be reached in a direct action to nonetheless be reached in a derivative action
for indemnity pursuant to a cross-complaint brought in a direct action which has been timely filed under
subdivision (a)." (Valley Circle Estates, at pp. 610-611.)
The
California Supreme Court's description of the second portion of subdivision (c) of section 337.15 contradicts
Subcontractors' position that the term "action" excludes a cross-complaint for indemnity. Instead, the language
used by our Supreme Court makes it clear that an indemnity claim pursued through a cross-complaint is an action,
albeit a "derivative action" rather than a "direct action." (Valley Circle Estates v. VTN Consolidated,
Inc., supra, 33 Cal.3d. at p. 610.) {Slip Opn. Page 15}
Second,
nothing in any portion of section 337.15 or the materials cited by the parties demonstrates that the Legislature
intended to limit the willful misconduct exemption in subdivision (f) to direct actions and to subject
derivative actions alleging willful misconduct to the 10-year limitations period. Further, common sense
dictates that the term "action" used in subdivision (f) of section 337.15 applies to all actions, whether direct
or derivative. If the term "action" in subdivision (f) were interpreted to mean only direct actions, then the
Cross-Complaint would have been time barred, but Developer-Seller still could pursue an indemnity claim based on
willful misconduct in an exempt direct action. Accordingly, we will not interpret the term "action" to mean only
direct actions. We can identify no policy reason for barring the use of cross-complaints when the same claim
could be pursued in a direct action.
Third,
the interpretation that the term "action" includes both direct and derivative actions is compatible with the
rule of statutory construction that a court should not construe a statute to "insert what has been omitted" by
the Legislature. (§ 1858.) In this case, it would violate section 1858 to construe subdivision (f) of section
337.15 to cover only "direct actions" when the Legislature omitted the modifier "direct" from the statutory
text.
Fourth,
our construction of section 337.15 also is consistent with the general provisions of the Code of Civil Procedure
that define the terms "action," "civil action," and "pleading."
Initially,
we note that section 21 identifies an action as one of two classes of judicial remedies--the other class is
special proceedings. Section 22 sets forth the general definition of "action" as "an ordinary proceeding in a
court of justice by which one party prosecutes another for the declaration, enforcement, or protection of a
right, the redress or prevention of a wrong, or the punishment of a public offense." Under this broad
definition, two kinds of action exist--civil and criminal. (§ 24.) Section 30 defines a civil action as one
"prosecuted by one party against another for the declaration, enforcement or protection of a right, or the
redress or prevention of a wrong." {Slip Opn. Page 16}
In
this case, Developer-Seller is proceeding in a court of justice by prosecuting the Subcontractors for a
declaration of its right to indemnity. Thus, for purposes of section 30, Developer-Seller is pursuing a civil
action against the Subcontractor. It necessarily follows that Developer-Seller is pursuing an action for
purposes of section 22.
Furthermore,
section 422.10 provides that "[t]he pleadings allowed in civil actions are complaints, demurrers, answers, and
cross-complaints." Thus, a cross-complaint is a type of pleading--that is, it is a document used to pursue an
action, not the action itself. As a result, the term "action" cannot be interpreted to exclude claims pursued
through a cross-complaint.
Based
on the foregoing, we conclude the exemption from the 10-year statute of limitations for "actions based on
willful misconduct" (§ 337.15, subd. (f)) applies to derivative actions for indemnity that are pursued using a
cross-complaint.
III.
Incorporation by Reference to the Complaint
A.
Contentions of the Parties
Developer-Seller
contends that the trial court erred in concluding that the Cross-Complaint "makes no allegations of willful
misconduct" and granting summary judgment on that basis.
Developer-Seller's
contention is based on the following grounds: (1) the Cross-Complaint effectively alleged willful misconduct
against Subcontractors by incorporating by reference Buyer's FAC and (2) Subcontractors waived the issue
regarding the sufficiency of the Cross-Complaint by failing to raise their challenge during the pleading stage.
Buyer adds the arguments that (1) physically attaching a copy of the FAC to the Cross-Complaint was not
required, (2) Western was on notice that the factual allegations in the FAC formed the basis for the
Cross-Complaint and (3) "... any doubt as to which 'causes of action ... are irrelevant' can easily be resolved
(and were resolved) through discovery. [Citation]." (Fn. omitted.)
Noting
that the Cross-Complaint contained no specific allegations of willful misconduct, Subcontractors argue that the
incorporation by reference of Buyer's FAC {Slip Opn. Page 17} into the Cross-Complaint was insufficient to
allege willful misconduct and to provide adequate notice of the claim against them. Weber-Iness Associates and
Western further contend that Buyer never filed actions against Weber-Iness Associates and Western or amended its
FAC to add them as Doe defendants.
B.
Contents of the Pleadings
The
operative pleadings central to this issue are Buyer's FAC filed October 15, 2004, and Developer-Seller's
Cross-Complaint filed October 6, 2006.
The
relevant paragraphs within the FAC come under the heading, "FIRST CAUSE OF ACTION Against the Developers and
Contractors for Negligence." In paragraph 13 of the FAC, Buyer describes "Defendants Does 201 through 500" as
"... sometimes collectively referred to as the 'Contractors' ..." and those who "... designed, engineered,
surveyed, provided specifications for, tested, graded, prepared the site for, assembled, manufactured,
installed, supervised and provided other services and work related to the construction of the Property."
Paragraph 14 of the FAC alleges: "Defendants so negligently and defectively developed, constructed and provided
the services, work and materials for the Property, as described above, as to directly cause numerous and
pervasive defects and damages throughout the Property (the 'Deficiencies')." In paragraph 15 of the FAC, Buyer
alleges:
"Defendants'
conduct, as above described, was of a quality amounting to reckless disregard and/or willful misconduct. In
developing, constructing and providing the services, work and materials for the Property, as above described,
defendants intentionally performed acts of an unreasonable character in disregard of risks known to them and/or
so obvious that they must have been aware of them, and so great as to make it highly probable that harm in the
nature of the Deficiencies would follow."
Paragraphs
13, 14, and 15 were incorporated by reference into each cause of action contained in Buyer's FAC.
Paragraph
18 of the Cross-Complaint, under the heading "GENERAL ALLEGATIONS," states: {Slip Opn. Page 18}
"On
or about October 15, 2004, [Buyer] filed a first amended complaint (the 'Complaint') herein against
[Developer-Seller]s seeking damages for negligence, strict liability, breach of contract, breach of implied
warranty, breach of express warranty, bond liability, express contractual indemnity, and concealment. These
claims arise out of the construction of an apartment complex located at 353 and 373 West Nees Avenue in Fresno,
California (the 'Project'). The Complaint is incorporated herein by reference without admitting any of the
allegations contained therein." (Italics added)
C.
Applicable Rule of Law
"The
phrase 'incorporation by reference' is almost universally understood, both by lawyers and nonlawyers, to mean
the inclusion, within a body of a document, of text which, although physically separate from the document,
becomes as much a part of the document as if it had been typed in directly." (Republic Bank v. Marine
Nat. Bank (1996)
45 Cal.App.4th 919,
922.)
The
statutory pleading requirements in the Code of Civil Procedure do not explicitly address the practice of
incorporation by reference. The general requirement that a complaint or cross-complaint contain a "statement of
the facts constituting the cause of action, in ordinary and concise language" (§ 425.10, subd. (a)(1)) offers
little guidance. fn.
5 Furthermore, the California Rules of Court do not specifically address incorporation by
reference used at the pleadings stage.
Case
law, however, does address the practice: "The general rule is that in the absence of restrictions imposed by
statute or by rules of court, facts alleged in other pleadings in the same case may be incorporated by reference
in subsequent pleadings therein. [Citations.]" (Estate of Dargie (1939)
33 Cal.App.2d 148,
157.)
Courts
have applied this general rule to cross-complaints. "[A] cross-complaint must itself be sufficient and cannot be
cured by the pleadings in the original action, that {Slip Opn. Page 19} is, the complaint and answer, apart from
permissible incorporation by reference." (Berg v. Investors Real Estate Loan Co. (1962)
207 Cal.App.2d 808,
816.)
In
Turney v. Collins (1941)
48 Cal.App.2d 381,
the pleader in an amended answer and counterclaim incorporated by reference certain exhibits pleaded in the
original answer. The court concluded there was "not the slightest reason" for holding that a pleading could not
incorporate by reference an exhibit or allegation found in another pleading in the same case, even though the
pleading has been superseded by such later pleading. (Id. at p. 388.)
One
practice guide states that it generally is not good practice to incorporate by reference parts of other
pleadings in the same lawsuit, even though there is no rule against it. (Weil & Brown, Cal. Practice Guide:
Civil Procedure Before Trial (The Rutter Group 2008) ¶ 6:239, p. 6-66.) The practice guide modifies this advice
as follows: "One noteworthy exception: Cross-complaints for indemnification usually incorporate by
reference the allegations of the complaint as a 'shorthand' way of showing the existence of the claim for which
indemnification is sought." (Ibid.)
D.
Analysis
Based
on the authorities discussed above, we agree with Developer-Seller's contention that the Cross-Complaint
effectively alleged willful misconduct against Subcontractors by incorporating by reference Buyer's FAC.
Furthermore,
our examination of the contents of the relevant pleadings in this case convinces us that the allegations
incorporated by reference state that the Subcontractors engaged in willful misconduct.
Paragraph
13 of the FAC describes Doe defendants as "Contractors," who, in addition to performing the specific enumerated
tasks listed in the paragraph, "provided other services and work" related to the construction of the project.
Paragraph 14 refers to defendants fn.
6 who "so negligently and defectively developed, constructed and provided the {Slip Opn. Page
20} services, work and materials for the Property ... as to directly cause numerous and pervasive defects and
damages ...." Paragraph 15 of the FAC describes defendants' conduct as of a quality amounting to reckless
disregard and/or willful misconduct, again using the language "providing the services, work and materials for
the Property ..." and setting forth the elements for willful misconduct. These three paragraphs are incorporated
by reference into each cause of action in Buyer's FAC. The Cross-Complaint then incorporates by reference the
entire FAC via the general allegations set forth in paragraph 18. Based on the language contained in both the
FAC and Cross-Complaint, Subcontractors had sufficient notice that the indemnification claims against them
included willful misconduct as a theory of recovery. The statutory requirement that a cross-complaint contain a
statement of the facts constituting the cause of action in ordinary and concise language was satisfied.
E.
Conclusions
We
conclude that the general rule of law applicable to pleadings permits the Cross-Complaint to incorporate by
reference allegations contained in the FAC. The FAC alleges that defendants--a term defined broadly enough to
include the Subcontractors--engaged in willful misconduct. It follows that the Cross-Complaint contains an
indemnification claim based on willful misconduct.
We
concluded earlier that the 10-year limitations period for latent construction defects does not apply to an
indemnification claim based on willful misconduct and pursued using a cross-complaint. (§ 337.15, subd. (f).)
Therefore, we further conclude that the Cross-Complaint asserts a theory of recovery that is not barred by the
10-year limitations period set forth in section 337.15. Consequently, the order granting the Subcontractors'
motions for summary judgment cannot be upheld on statute of limitations grounds. {Slip Opn. Page 21}
IV.
Failure to Present Evidence of Willful Misconduct fn.
*
The
superior court's written ruling stated one of the grounds for denying the motions for reconsideration was that
Developer-Seller provided no evidence showing that the Subcontractors were guilty of willful misconduct or
concealment. Subcontractors contend the order granting their motions for summary judgment can be upheld on this
ground.
The
separate statements filed by Avila Cement and Weber-Iness Associates in connection with their motions for
summary judgment did not attempt to negate the willful misconduct element of Developer-Seller's indemnity claim.
Accordingly, those motions failed to address a theory of recovery reasonably contemplated by the Cross-Complaint
and cannot survive step one of the three-step Brantley analysis. (Brantley, supra, 42
Cal.App.4th at p. 1602.)
Western's
separate statement asserted (1) it made no attempt to conceal the fact that flashing paper was not installed
with the windows and (2) the failure to install flashing paper was not misconduct because it was not required by
the building code or by standard practice existing at that time. As described earlier, Developer-Seller and
Buyer disputed these assertions of fact by Western. For example, Buyer submitted the declaration of Posard to
dispute Western's assertions that it complied with the building code and with standard practice in the industry
and the Central Valley.
As
a result, we conclude that the parties opposing Western's summary judgment motion have shown the existence of a
triable issue of material fact, which precludes the grant of summary judgment in Western's favor.
V.
Attorney Fees and Costs Under Section 1038 fn.
*
The
orders granting attorney fees and costs to Avila Cement and Weber-Iness Associates depended on the fact that
they prevailed on their motions for summary {Slip Opn. Page 22} judgment. Because the order granting those
motions for summary judgment will be vacated and the matter remanded for further proceedings, it follows that
the orders granting attorney fees and costs on the ground that Developer-Seller proceeded with its
Cross-Complaint without good faith and reasonable cause also must be overturned.
DISPOSITION
The
judgment in favor of cross-defendants Western, Avila Cement, and Weber-Iness Associates is reversed. The matter
is remanded to the superior court for further proceedings and with directions to (1) vacate its July 20, 2007,
order granting cross-defendants' motions for summary judgment and (2) vacate its orders granting the motions of
Avila Cement and Weber-Iness Associates for attorney fees and costs pursuant to section 1038.
Plaintiff
and defendants/cross-complainants shall recover their costs on appeal.
Levy,
Acting P.J., and Hill, J., concurred.
FN *. Pursuant
to California Rules of Court, rules 8.1105(b) and 8.1110, this opinion is certified for publication with the
exception of parts I., IV., and V.
FN 1. All
further statutory references are to the Code of Civil Procedure, unless indicated otherwise.
FN *. See
footnote, ante, page 1.
FN 2. In
Guz v. Bechtel National, Inc. (2000)
24 Cal.4th 317,
the California Supreme Court used the term "hypothesis" instead of theory of recovery. (Id. at p. 334.)
FN 3. Section
428.10, subdivision (b) allows a party to assert: "Any cause of action he has against a person alleged to be liable
thereon, whether or not such person is already a party to the action, if the cause of action asserted in his
cross-complaint (1) arises out of the same transaction, occurrence, or series of transactions or occurrences as the
cause brought against him or (2) asserts a claim, right, or interest in the property or controversy which is the
subject of the cause brought against him."
FN 4. Subdivision
(c) of section 337.15 thus alters the common law rule that a cause of action for equitable indemnity does not
accrue until the indemnitee has suffered an actual loss by paying a judgment or settlement. (Lantzy,
supra, 31 Cal.4th at p. 378, fn. 12.)
FN 5. The
policy underlying this requirement "is to inform the parties within reasonable limits of the nature of the action
pending and the issues involved." (Casaretto v. De Lucchi (1946)
76 Cal.App.2d 800,
806.)
FN 6. Defendants
include Developer-Seller and Does. The FAC's description of Does is broad enough to include Subcontractors.
FN *. See
footnote, ante, page 1.
FN *. See
footnote, ante, page 1.
|